Tough, Long Day...
Was a bit more work than I expected getting the Second Floor I-Joists properly placed and secured...
A ratchet and a few straps from Isaac brought it together ; )
A ratchet and a few straps from Isaac brought it together ; )
Wednesday, May 29, 2013
Top Plate...
One of the cool side benefits of building the double wall is the 11" top plate that also serves as a nice catwalk to move around for the next step of Rim Boards and I-Joists...
Just worked a half day with the rain today. Worked out nice as I had my laundry to do in town and several errands.
Nicer weather is on the way!!!
Just worked a half day with the rain today. Worked out nice as I had my laundry to do in town and several errands.
Nicer weather is on the way!!!
Tuesday, May 28, 2013
Double Walls...
With Jake's great help, we were able to get all the interior perimeter walls up - making an 11" cavity for insulation...
The view from the couch...
The view from the couch...
Monday, May 27, 2013
Sunday, May 26, 2013
Sunday...
The long North and South walls are framed and sheathed...
They just need to find a way to make themselves upright ; )
They just need to find a way to make themselves upright ; )
Friday, May 24, 2013
Today's Progress...
A couple of small walls went up, and the big South Wall with the majority of the window openings was framed - sheathing tomorrow, and round up some help to lift it on Sunday ; )
Thursday, May 23, 2013
It's begun...
Got a couple of the 12' walls up that make up the bump out/deck...
Had a couple of level issues which extended my day a little too long ; )
Had a couple of level issues which extended my day a little too long ; )
Wednesday, May 22, 2013
Another Rainy Day...
Took today to run errands, do laundry, get groceries, and make a cut list for each wall of the house as my lumber arrives tomorrow morning, and hopefully, the rain goes away...
Tuesday, May 21, 2013
What an Afternoon...
I thought that I was going to have a chance to relax after my early morning concrete cutting in the rain, but alas, no.
My hot water heater in the RV had stopped working and I went inside to figure out what I could when I discovered a new water feature in the center of the RV ceiling - all around the A/C was pouring water from the over half inch of rain we got today...
Shit.
Had some left over Vapor Barrier from the slab and managed to secure it up top with several long length 2x6's as the accompanying wind wouldn't allow the simple placement of the plastic.
Having finished that, I returned to the task of fixing the H2O heater, and after some investigation it turns out that one of the leads from the Dino Box had broken - was then informed by the local propane company that I could find the part in Okanogan or Wenatchee - hoping for something closer, they suggested trying the Riverbend RV park outside Twisp. I called and they said to bring the Dino Box in and see if it might match the one they had - long story short, Ed - the owner of the RV park, soldered a new tab on my old ignitor box instead of selling me a $125 new Dino Box - THANKS ED!!!
Now, after putting this pictured securable new tarp, and soaking myself to the bone doing it, I get a nice warm shower - YAHOO!
My hot water heater in the RV had stopped working and I went inside to figure out what I could when I discovered a new water feature in the center of the RV ceiling - all around the A/C was pouring water from the over half inch of rain we got today...
Shit.
Had some left over Vapor Barrier from the slab and managed to secure it up top with several long length 2x6's as the accompanying wind wouldn't allow the simple placement of the plastic.
Having finished that, I returned to the task of fixing the H2O heater, and after some investigation it turns out that one of the leads from the Dino Box had broken - was then informed by the local propane company that I could find the part in Okanogan or Wenatchee - hoping for something closer, they suggested trying the Riverbend RV park outside Twisp. I called and they said to bring the Dino Box in and see if it might match the one they had - long story short, Ed - the owner of the RV park, soldered a new tab on my old ignitor box instead of selling me a $125 new Dino Box - THANKS ED!!!
Now, after putting this pictured securable new tarp, and soaking myself to the bone doing it, I get a nice warm shower - YAHOO!
Score!!!
Got out there a little before 6 (Sorry Neighbors) in hopes of beating the rain, but merely ended up making sure I was there to meet it ; )
The rain actually helped in the scoring of the concrete as it kept the blade wet and cool - it went well. I flipped the GFI a few times and thus started holding on to the cord junction as I cut the concrete to keep water from getting in to the plugs - worked real well until just about the last cut when everything was so wet, including my gloves, that I became part of the electrical circuit ; )
The rain actually helped in the scoring of the concrete as it kept the blade wet and cool - it went well. I flipped the GFI a few times and thus started holding on to the cord junction as I cut the concrete to keep water from getting in to the plugs - worked real well until just about the last cut when everything was so wet, including my gloves, that I became part of the electrical circuit ; )
Monday, May 20, 2013
Foundation complete!
Thank you, J.R. and the crew at 5 Star Concrete - looks great!
Now hopefully I can keep it wet enough as this lovely wind tries to suck the moisture out of it a bit too quickly...
Now hopefully I can keep it wet enough as this lovely wind tries to suck the moisture out of it a bit too quickly...
Sunday, May 19, 2013
Random pics from the day...
Since I am sure you are not interested in seeing pics of me moving gravel, cutting re-bar, or placing bolts ; )
Our view, South...
The Tree I designed the house around...
I don't know the name of this small flower, but they are popping up all over the property...
This is called an Elegant Cat's Ear...
Our view, South...
The Tree I designed the house around...
I don't know the name of this small flower, but they are popping up all over the property...
This is called an Elegant Cat's Ear...
Saturday, May 18, 2013
Morning Ride...
Went out on the Cross Bike and rattled myself for 4 hours...
Took this pic at the end of Pipestone Canyon next to a great Bouldering Rock...
Set the camera on the ground and hit the timer - it appears the camera auto focus was on the grass, not me - probably for the best as the snot on my face was not so visible ; )
Took this pic at the end of Pipestone Canyon next to a great Bouldering Rock...
Set the camera on the ground and hit the timer - it appears the camera auto focus was on the grass, not me - probably for the best as the snot on my face was not so visible ; )
Friday, May 17, 2013
Thursday, May 16, 2013
The past 24 Hours...
Gravel and Radon Rock...
4" of Rigid Foam...
A Vapor Barrier...
And 4" of sand...
Makes a very expensive Cat Box ; )
Wednesday, May 15, 2013
Tuesday, May 14, 2013
Monday, May 13, 2013
Inset Entry...
Built the thermal break and a metal grate inset jig in preparation for the slab pour for the inset entry to the house...
Sunday, May 12, 2013
Did I mention...
That my technical skills on a Mountain Bike are lacking...
May have to go back and spend more time with the Cross Bike ; )
May have to go back and spend more time with the Cross Bike ; )
Saturday, May 11, 2013
Ready for Rock!
Finished the wall insulation and beveling...
Gravel and radon rock early next week, then finish the plumbing waste lines, two layers of insulation, vapor barrier, sand, then the following week... The SLAB!!!
Gravel and radon rock early next week, then finish the plumbing waste lines, two layers of insulation, vapor barrier, sand, then the following week... The SLAB!!!