Monday, August 19, 2013

Taking a break...

Here's some pics of the house at the present stage...

From the South...


From the Southwest...


From the West, with the garage in the background...


And the garage that I built last Summer...


Tuesday, August 13, 2013

Jake just dropped these off...

He welded up the brackets that will support the trellises above each of the South Side window banks...



Thanks, Jake!



Monday, August 12, 2013

The gates are done...

Just finished installing the farm gates...



Spent the early part of the day loading the Subaru interior and top rack with used building materials, and delivering them to Methow Resource Recovery - a building materials reuse center.


Saturday, August 10, 2013

Today's work...

With exterior door painting complete, the lockset inserts have been chiseled and the hardware installed...

No more "wild" visitors pooping inside the house - until it's complete and the family arrives ; )



Yesterday's pics...

Was too tired to post last night after my nephew's departure ; )

We dove in the river, skipped rocks, had water bazooka fights, practiced armpit farting, cursed, checked out hot chicks, went to the Sherri's Sweet Shoppe, snake hunted, discussed the virtues of Loki, Thor, Superman and the Incredible Hulk, played bloody knuckles,  had a 2-hour pillow battle, and finished the day off with dinner with the family...

I slept in this morning.





Wednesday, August 7, 2013

Tuesday, August 6, 2013

Trouble...

I just finished uploading these pics when I looked out the window of the RV to possibly take some more when I noticed all but the last of the 4 babies had disappeared into the house with mom.  I was going to leave them alone, so as not to freak them out, until I saw them banging up against the inside of the windows...  So I went in and assisted them out - they are not crazy about being held ; )



Started on the Rail Caps...

Picked up the Yellow Cedar 2x10's this morning...

Started belt sanding them...


Routed out the length of a football field - 300'...  3/4"width  at a time ; )


And finish sanded them...


Will cut to length and put some UV protection on them in the next few days before placing them, depending on what else I have going...


Monday, August 5, 2013

Exterior doors...

Painting the exterior doors to match the window trim...



I'm in love...

Went looking for the deck rail cap at Bear Creek Lumber, and fell in love with the true 2X10 Yellow Cedar...


This is just a sample piece of scrap.  I will pick the order up today or tomorrow and do a bit of router work, cutting, sanding  and UV protection before I apply it...


Last night's sunset...



Saturday, August 3, 2013

A few pics from today's ride...

A 65 miler with an 11.5 mile climb up Falls Creek - one of my favorite climbs as it is a dead-end unused logging road that gains 3,000'...

A beautiful old silo on East County Road...


Dining on one of the fields on the Valley Floor...


A view of Big Craggy on my way up Falls Creek...



Thursday, August 1, 2013

Waiting for the metal trim...

So we finished the interior side of the deck...


Just need the rail cap and the trim metal, and the Bump-Out will be complete.