For not posting progress reports...
The plumbing is about 90% complete, and I will only get the placement of the switches, outlets and lights before I go.
Today I put in a dropped ceiling for the hallway and above the main kitchen area for some visual interest...
Thursday, September 26, 2013
Saturday, September 21, 2013
Suppose I should give an update...
The rough-in plumbing is nearly complete...
And I have a large bump on my head from leaping out of the well rings through a very small porthole after I turned the water back on from inside the casings...
I heard a noise that alarmed my primal core and turned to see a rattlesnake staring at me from a foot and a half away as he sat on one of the controls that was mounted on the inside of the concrete casing rings... I shot straight up that porthole that had me struggling to get out of an hour earlier.
Good thing I had taken a large duke that morning or I most likely would have soiled my drawers ; )
And I have a large bump on my head from leaping out of the well rings through a very small porthole after I turned the water back on from inside the casings...
I heard a noise that alarmed my primal core and turned to see a rattlesnake staring at me from a foot and a half away as he sat on one of the controls that was mounted on the inside of the concrete casing rings... I shot straight up that porthole that had me struggling to get out of an hour earlier.
Good thing I had taken a large duke that morning or I most likely would have soiled my drawers ; )
Tuesday, September 17, 2013
Back to work...
Just for a couple of weeks...
Flew in this morning, with an extra bonus from a very generous friend...
And here was my greeting committee at the house...
Not to mention the sight and smell of dead mice in the RV ; )